Monday 27 February 2012

To Do List

I've gotta apologize in advance for this list. The only thing amusing about it is it's scope. (This is why it'll take me a year...)

  • Whole house: Paint, new flooring throughout
  • Porch: New screens, shave down door, repaint doors
  • Foyer: Re-hang coat pegs, fix bench
  • Living Room: Hire electrician for overhead fixture (frayed wire), get new fixture installed, move studio stuff to basement, buy couch, set up as an actual living room
  • Dining Room: Wallpaper ceiling, fix curtain rod (loose)
  • Kitchen: Fix one loose tile, get Corian countertop installed in built-in, install backsplash (tin tile), side panel for dishwasher area
  • Mudroom: New counter top (tiles?), install floating shelf, new doors to outside
  • Bedroom: Fix loose curtain rod, repaint dresser, strip oak dresser, build headboard, light fixture
  • Bathroom: New flooring, new sink/vanity, replace wrought iron fixtures with nickel, countertop for shelf, new light fixture
  • Lounge/Office: Take out divider wall, fix window surround in office (tongue and groove?) paint desk, replace closet door, install moulding around built-in shelf
  • Basement: Insulate, drywall, paint floor, ceilings, install wall separating utility areas from open area install window, lights
  • Backyard:  New steps from mudroom, sink posts for hammocks, install gate at front, install posts and panel to hide neighbours shed




No comments:

Post a Comment