- Whole house: Paint, new flooring throughout
- Porch: New screens, shave down door, repaint doors
- Foyer: Re-hang coat pegs, fix bench
- Living Room: Hire electrician for overhead fixture (frayed wire), get new fixture installed, move studio stuff to basement, buy couch, set up as an actual living room
- Dining Room: Wallpaper ceiling, fix curtain rod (loose)
- Kitchen: Fix one loose tile, get Corian countertop installed in built-in, install backsplash (tin tile), side panel for dishwasher area
- Mudroom: New counter top (tiles?), install floating shelf, new doors to outside
- Bedroom: Fix loose curtain rod, repaint dresser, strip oak dresser, build headboard, light fixture
- Bathroom: New flooring, new sink/vanity, replace wrought iron fixtures with nickel, countertop for shelf, new light fixture
- Lounge/Office: Take out divider wall, fix window surround in office (tongue and groove?) paint desk, replace closet door, install moulding around built-in shelf
- Basement: Insulate, drywall, paint floor, ceilings, install wall separating utility areas from open area install window, lights
- Backyard: New steps from mudroom, sink posts for hammocks, install gate at front, install posts and panel to hide neighbours shed
Monday, 27 February 2012
To Do List
I've gotta apologize in advance for this list. The only thing amusing about it is it's scope. (This is why it'll take me a year...)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment